← Tenders in Cameroon

THE CONSTRUCTION OF A REINFORCED CONCRETE MOM BRIDGE LINKING NJENKA AND MOM ALONG THE NJENKA-MOM ROAD AND THE CONSTRUCTION OF MBATMANDET BRIDGE LINKING MBATMANDET-FONTUH ROAD INBALIBALI COUNCIL AREA, MEZAM DIVISION OF THE NORTHWEST REGION BY EMERGENCY PROCEDURE. Financing: BIP Budget of 2026/2027

BuyerMAIRE DE BALI
Deadline10/12/2026 at 10:00 15 days left
Reference03/ONIT/BC/BCITB/2026OF 17/11/2026
Published24 November 2026
RegionNorth-West
Sectorroads and transport
Budget149 000 000 FCFA

Open the official notice ↗

In short

Construction of the reinforced concrete MOM bridge (Njenka-Mom) and Mbatmandet bridge (Mbatmandet-Fontuh road) in Bali, emergency procedure.
Contracting authority: Mayor of Bali. Estimate 149,000,000 FCFA; bid bond 2,980,000 FCFA; bids due 10/12/2026 at 10:00.

The full Bid-Ready brief

Bid bond, administrative documents, eliminatory criteria, where and how to submit: sign up to read the full brief (14 days free).

Read the full brief

Adjudia is not affiliated with ARMP, MINMAP or COLEPS. Always check the official tender file.