THE CONSTRUCTION OF A REINFORCED CONCRETE MOM BRIDGE LINKING NJENKA AND MOM ALONG THE NJENKA-MOM ROAD AND THE CONSTRUCTION OF MBATMANDET BRIDGE LINKING MBATMANDET-FONTUH ROAD INBALIBALI COUNCIL AREA, MEZAM DIVISION OF THE NORTHWEST REGION BY EMERGENCY PROCEDURE. Financing: BIP Budget of 2026/2027
| Buyer | MAIRE DE BALI |
| Deadline | 10/12/2026 at 10:00 15 days left |
| Reference | 03/ONIT/BC/BCITB/2026OF 17/11/2026 |
| Published | 24 November 2026 |
| Region | North-West |
| Sector | roads and transport |
| Budget | 149 000 000 FCFA |
In short
Construction of the reinforced concrete MOM bridge (Njenka-Mom) and Mbatmandet bridge (Mbatmandet-Fontuh road) in Bali, emergency procedure.
Contracting authority: Mayor of Bali. Estimate 149,000,000 FCFA; bid bond 2,980,000 FCFA; bids due 10/12/2026 at 10:00.
The full Bid-Ready brief
Bid bond, administrative documents, eliminatory criteria, where and how to submit: sign up to read the full brief (14 days free).
Read the full briefAdjudia is not affiliated with ARMP, MINMAP or COLEPS. Always check the official tender file.