Restoration of green space in tobin, kumbo central sub division, bui division of the north-west region
| Buyer | MAIRE DE KUMBO |
| Deadline | 01/12/2026 at 10:00 6 days left |
| Reference | 008ONIT/KC/KCITB/FEICOM 2026 |
| Published | 24 November 2026 |
| Region | North-West |
| Sector | construction / works |
| Budget | 49 000 000 FCFA |
In short
1) Restoration of a green space in Tobin (Kumbo Central, Bui, North-West), open national tender by emergency procedure launched by the Mayor of Kumbo (FEICOM). 2) Bids due 01/12/2026 at 10:00; bid bond FCFA 100,000. 3) Elimination risk: missing or insufficient bid bond, administrative documents older than 3 months or non-conforming.
The full Bid-Ready brief
Bid bond, administrative documents, eliminatory criteria, where and how to submit: sign up to read the full brief (14 days free).
Read the full briefAdjudia is not affiliated with ARMP, MINMAP or COLEPS. Always check the official tender file.