Réhabilitation de la route Inter R0113-Carrefour Edjom-Edouma-Biba’a-Limite Endom-Mbaga-Carrefour Essoa-Adjap
| Buyer | SERVICES DU GOUVERNEUR DE LA REGION DU CENTRE |
| Deadline | 20/11/2026 at 12:00 Closed |
| Reference | COLEPS 20261100144-00 |
| Published | 19 November 2026 |
| Region | Centre |
| Sector | roads and transport |
| Budget | 249 900 000 FCFA |
In short
Rehabilitation of the Inter R0113-Carrefour Edjom-Edouma-Biba’a-Limite Endom-Mbaga-Carrefour Essoa-Adjap road, by the Services du Gouverneur de la région du Centre, budget 249,900,000 FCFA.
Offers due by 20/11/2026 at 12:00; bid bond of 200,000 FCFA.
The full Bid-Ready brief
Bid bond, administrative documents, eliminatory criteria, where and how to submit: sign up to read the full brief (14 days free).
Read the full briefOther tenders from this buyer
Contrôle et surveillance technique et geotechnique des Travaux de bitumage (en Béton Bitumineux de la voie de contournement entrée Eglise Catholique de Nkongoa-Tom (Inter R0104- Carrefour Mekon dans la Région du Centre. Longueur 9,700 kilomètres
Travaux de bitumage (en Béton Bitumineux) de la voie Lycée de NKOLAFAMBA- Carrefour NKOLAFAMBA – (Inte N10) et bretelles dans la Région du Centre
Adjudia is not affiliated with ARMP, MINMAP or COLEPS. Always check the official tender file.