Au gardiennage des biens, des installations portuaires et le contrôle de la circulation des usagers au port autonome de douala
| Buyer | PAD |
| Deadline | 17/12/2026 at 12:00 22 days left |
| Reference | 017/AONO/CIPM-AS/PAD/2026 |
| Published | 17 November 2026 |
| Region | Littoral |
| Sector | services |
| Budget | 798 140 250 FCFA |
In short
Guarding of property, port facilities and traffic control at the Port Autonome de Douala, in 3 lots (estimated cost 798,140,250 FCFA incl. tax)
Physical bid submission before 17/12/2026 at 12:00; bid bond of 7,608,000 FCFA (lot 1), 6,110,000 FCFA (lot 2) and 2,243,000 FCFA (lot 3) with CDEC receipt
The full Bid-Ready brief
Bid bond, administrative documents, eliminatory criteria, where and how to submit: sign up to read the full brief (14 days free).
Read the full briefOther tenders from this buyer
Appel d’offres national ouvert n°015/aono/cipm-icae/pad/2026 du 04 novembre 2026pour le controle et la surveillance des travaux de construction du second œuvre d’un immeuble r+3 devant servir de case communautaire au canton akwa.
Appel d’offres national ouvert n°016/aono/cipm-icae/pad/2026 du 04 novembre 2026pour les travaux de construction du second œuvre d’un immeuble r+3 devant servir de case communautaire au canton akwa.
Adjudia is not affiliated with ARMP, MINMAP or COLEPS. Always check the official tender file.